What's a fair quote for a kitchen refit in Adelaide?

A one-line "kitchen refit — $35k" tells you nothing. Here is what an itemised, defensible Adelaide kitchen quote actually contains — and the four red flags that mean walk away.

Published 15 Mar 2026Updated 8 May 20263 min readBy Founder

A fair Adelaide kitchen refit quote breaks the job into line items: demo, cabinetry, benchtop, splashback, plumbing, electrical, appliances (supply or PC sum), painting, and contingency. Each line should reflect real materials and labour at market rates — not a single bundled number that hides what you are paying for.

What an itemised kitchen quote should include

  • Demo and disposal — separate line, not folded into "labour"
  • Cabinet carcasses — flat-pack vs custom-made, with brand and material specified
  • Cabinet doors and hardware — soft-close runners, hinge brand, handle spec
  • Benchtop — material (laminate, stone, composite), brand, slab count, edge profile
  • Splashback — tile, glass, or stone with supply unit cost shown
  • Plumbing — rough-in, fit-off, sink/tap supply (or PC sum)
  • Electrical — circuits, GPOs, lighting, oven/cooktop hardwire
  • Painting — wall and ceiling repaint after install
  • Appliance supply — line items per appliance OR a PC sum if you supply
  • Contingency — typically 8-12% for hidden substrate or service relocation

Red flags in a kitchen refit quote

  1. 01A single bundled number with no breakdown — you cannot adjust spec to budget
  2. 02No contingency line — every kitchen refit hits at least one substrate surprise
  3. 03Verbal-only quote with text-message confirmations — disputes are unwinnable
  4. 04No payment schedule tied to milestones — full deposit upfront is rare in a fair quote

How Briks quotes a kitchen refit

A Briks coordinator attends, measures, photographs the existing kitchen, and discusses spec on-site. The quote comes back as a line-item PDF within 5 working days, with optional spec variations called out (laminate vs stone, flat-pack vs custom). You sign off on the version you want — no bait-and-switch on the second visit.

Realistic Adelaide kitchen timeline

A typical 3-trade kitchen refit (cabinetry, plumbing, electrical, painting) takes 3-4 weeks of trade work plus a 4-8 week supply lead for benchtops and custom cabinetry. From quote sign-off to completion: typically 8-12 weeks calendar time.

Frequently asked

Quick answers.

A standard 3-trade kitchen refit takes 3-4 weeks of on-site work plus 4-8 weeks of supply lead time for benchtops and custom cabinetry. Calendar time from quote sign-off is typically 8-12 weeks.